Aww for crying out Pete's loud sake. After all this an annoying drip, drip, drip. Where in hell is that leak coming from? Rain reveals all don't you know. As I peeked and peered and probed it eluded me. After covering everthing with tape, buckets and whatnot the leak tasked me. In a moment of shear epiphany it occured to me the two freaking holes from the emblem pop rivets were wide freaking open. A dab of modeling clay proved to be the solution until I mount them. Bilge pump check, water system check, handrails on their way and that's about it till spring. Then on go the emblems as the handrails are the last restoration item. Batteries, lifelines, bottom paint and rigging are pretty much spring time chores. So I guess I can say, YEEHAW and phwew. Oh yeah and the mast is waiting for a boat headed south for it's rework. No hurry there as it will be done indoors. OOOOPPS one more thingy. Pyacht in Maryland has 9 loop teak handrails for the lowest price I could find. http://www.pyacht.com/cgi-bin/pagegen.pl?pr+hnl409T.html