she is coming along. New standing and running riggings, harken jib fuller, steaming light, flood lights, tricolor mast head light, nav/auto-pilot system, Gaharuer traveler, fiddle mainsheet block, rebedded deck hardware, replaced stove, VHF radio, antenna, clutch in the tranny, shifting and power cables, heat exchanger, fresh water pump, impeller, hoses, some wiring redone in side, rub rails, eye brows, tie rails, hatch, gaskets in opening ports, repaired cockpit where core was rotting. new main sail cover ordered. Geez that is most of what I can recall at the moment. Here is a shot of the near done boat before I post the remaining issue for advice.