For those of us in sates with boats on the hard whats on your To Do list this winter?
For me;
New Main Sail and Strong Track system (already paid for Track and put dept on the sail) Went with a Ullman Edurance Series
Plan on installing new wind instruments as well
and I have some minor crazing to repair from the PO on the starboard side of the haul.
Might redo the bottom paint while I am at it.
For me;
New Main Sail and Strong Track system (already paid for Track and put dept on the sail) Went with a Ullman Edurance Series
Plan on installing new wind instruments as well
and I have some minor crazing to repair from the PO on the starboard side of the haul.
Might redo the bottom paint while I am at it.