Thought I'd post up an update for my Winter To Do List as my splash date of April 15th approaches.
1. New Solar Vent installed. Opted for solar again...there was some discussion earlier about benefits of non solar.
2. Sanded the wing on the keel down to bare metal and re-primed and painted. (very dirty job)
3. Fresh bottom paint, entire haul
4. Repaired haul crazing left for me by PO (equally time consuming and dirty job I might add)
5. Reworked control lines on Vang and Traveler
6. New sheets on Main
7. Installed AWI
8. Installed AWI LED light
9. Bought a new Main Sail from Ullman Sails
10. Installed Strong Track system on mast.
11. Replaced all interior and exterior bulbs, but one in the mast to LED
12. New Vinyl
http://infinitylwv.com/view-our-collections/nggallery/galleries/better-than-teak-ii Carpet installed. Love this product by the way!
Still need to;
1. Install new display head on the Auto Helm
2. Trouble shoot hand held VHF connection in the cockpit
3. Upgrade speakers
4. Repair hole in dinghy
5. Give the haul gel coat a good cleaning and power waxing
6. Change oil
7. Replace impeller
Come ON SPRING! Only 18 degrees and windy here in MI today...