As I will be getting my boat into the water after a few years of being deployed to Japan I will be:
Installing Jacklines to keep my kids (3 and 6) inside the boat.
Raw water strainer service and intake inspection.
Running/standing rigging inspection and mast stepping (with new mast base plate).
OK...that was really about 5 projects......sorry! :dance:
Installing Jacklines to keep my kids (3 and 6) inside the boat.
Raw water strainer service and intake inspection.
Running/standing rigging inspection and mast stepping (with new mast base plate).
OK...that was really about 5 projects......sorry! :dance: