Hello All. I need to have a couple of spots welded on my bow pulpit. One is at the base of a vertical leg. I'd like to take it in to a shop because it would likely be less expensive to do so, but I can't see how it's attached to the deck. The bases of all the legs are under the toe rail. Has anyone had experience with this?
Thanks.
Thanks.