First things first
Going to take the sails out and clean 'em real well. Also taking all items out that are not bolted, glued, fiberglassed, stuck in the boat. Inventory all items. look for cracks in the cabin floor, then repair with glass. Inspect the hatches, put new gaskets on all ports. Inspect the bulkheads and figure out how to get those buggers out, then rebuild from wood or Aluminum. Inspect chain plates, and recock and reseat. Inspect coach and deck for spider cracks, then Dremel out cracks and fill with epoxy, sand. Remove deck hardware, fill screw holes with epoxy, redrill and tap where required and remount all deck hardware. The Keel, peel away glass that is damaged, then reglass. Sails: inspect for damage, replace with new sails as appropriate. Interior: remodel, inspect Head and replace with new unit. That will have all repairs done, as well as remodeling. Time frame, about 6 ~ 9 months, faster if things are easier to do then we are anticipating.