A bit late on my response.
Couple of closing comments.1. pretty sure this was the easist upgrade I've done. The product came from Catalina parts in 2 days, the fastners were included, put a mark on the drill bit to ensure that I do not do a drill through, and go forward. All told 20 minute install, can't beat that!2. The bags work out nicely. two pockets per bag. Here's how I've organized in one week, may change, but it may be right, who knows. starboard side, main halyard is at the bottom of a bag, second reef is in the same bag, vang is in the same bag. In the other bag stb side, is the main and stbd jib sheet. port side, one bag contains, jib halyard and spinaker halyard, and other side of mainsheet (note, I only work mainsheet from prt side). The other port bag contains genoa sheet, and winch handles. Generally keep the traveler lines on top of the companion way sliding cover. I keep the cunningham and outhaul at the mast. I'll probably adjust over time, and if people are interested, I'll post changes.Regards,