R
Robert Sagebiel
We just sailed / motored 160 miles around NJ (Riverside to Barnegat Bay)... used the ODay 322 reefing system and it worked well. But I did not have a diagram of the proper set up (I guessimated the line runs for the 1st and 2nd reefs). I lost a mast fitting (1 inch SS ring) that is held on to the mast with 3 pop rivets (one on the port side and one on starboard side) near the gooseneck. I ran the 1st reefing line through the starboard ring and the 2nd reefing line through the port ring. I did this in the belief that it would hold the mainsail’s Cunningham at each reef point closer to the gooseneck.Does anyone have a diagram showing the proper rigging of these reef lines?