I just took delivery of two new Lewmar 40 winches. There was no paperwork in the boxes (other than an invoice copy).
In decades past, their winches always came with well-illustrated install instructions.
I recall that orientation of the base is important to fully handle the incoming line load.
Anyone know where to find this info? There must be a PDF or something on line... somewhere.
(I also left my question via email with the vendor/chandler, but have not yet heard back.)
Thank you.
In decades past, their winches always came with well-illustrated install instructions.
I recall that orientation of the base is important to fully handle the incoming line load.
Anyone know where to find this info? There must be a PDF or something on line... somewhere.
(I also left my question via email with the vendor/chandler, but have not yet heard back.)
Thank you.
Last edited: