I'm looking to lead lines aft for my main halyard and lazy jack on my O'Day 25. Once these are done I'll look at running reefing lines back. Here's a few questions I have:
-I have a halyard organizer plate (it's a little wider as it came from a Cat 25) as well as an old Schafer double turning block. Neither is installed yet. Which would be better?
-Is a double stacked deck organizer necessary due to the narrow gap between the hatch and hand rail?
-Is it necessary to install a cabin top winch or can the Jib winches be used?
I did find this old post with some excellent pictures. Any other tips or recommendations anyone has would be very much appreciated
-I have a halyard organizer plate (it's a little wider as it came from a Cat 25) as well as an old Schafer double turning block. Neither is installed yet. Which would be better?
-Is a double stacked deck organizer necessary due to the narrow gap between the hatch and hand rail?
-Is it necessary to install a cabin top winch or can the Jib winches be used?
I did find this old post with some excellent pictures. Any other tips or recommendations anyone has would be very much appreciated