Looking for some suggestions on how to and where to position the 2 stoppers (cams) and cheek blocks on the mast when I rig up the inboard end of the spinnaker pole. The 8' track (1 1/4" - T) is already on the mast and is still have to add the upper + lower cheek block and stopper cams. Drill and screw or rivet?
Thanks
Thanks