Before finally moving on from this project, I thought I'd post some final images of the finished product. It was long and a PITA, but well worth it. I can now inspect and remove the hoses without ever removing the pan again. Well, actually, this is more for the next guy, LOL. Granted, the possibility exists that something bad will happen to the section of PVC pipe underneath, but I will hopefully address this by being able to periodically flush the system with fresh water via the special fitting in the raw water inlet. In the future, if anyone is looking for the progress pics I've inserted a link to the original thread. These pics will show the installed siphon break which is vented to the skin of the vessel, hanging locker bottom with the removable section, a detail of the new raw water connection, and the new raw water thru-hull. FYI, in case any of you are going to point out that I did not double clamp the raw water hose connections, I consulted with a couple of my ABYC friends and double clamping is only recommended when the barbed fitting is long enough to accommodate them. Otherwise single is acceptable. In this case, none were with a margin that I thought acceptable. What I did do was to use non-perforated clamps which are superior in performance and longevity when compared to their less expensive counterparts.
What's Under Here?
What's Under Here?
Attachments
-
343.6 KB Views: 106
-
500.6 KB Views: 121
-
428.6 KB Views: 123
-
355.7 KB Views: 101
-
374.8 KB Views: 119
-
323.2 KB Views: 106