hey guys. Q&A is over for at least one part:
so thats where i'm at. half way down the mast. Cabling for top light, n2k for wind sensor, vhf, wifi cat5, and the wiring for the steamer/decklight.
6in spacing on waxed twine lacing with 8 turns minimum each and 3 ft spacing on the track peices to hold it to the inside track of the mast. i'm incredibly optmistic that it'll do fantastically and i'm excited to start putting the mast together.
I'm taking the mast head to my dad's shop probably sunday to start the plan for putting it on the mill and drill/tap for each of the peices. sadly the mast itself can't go orwould it fit inside so we'll be hand tooling that for the new clamshell exit points and bracket mounting.
so thats where i'm at. half way down the mast. Cabling for top light, n2k for wind sensor, vhf, wifi cat5, and the wiring for the steamer/decklight.
6in spacing on waxed twine lacing with 8 turns minimum each and 3 ft spacing on the track peices to hold it to the inside track of the mast. i'm incredibly optmistic that it'll do fantastically and i'm excited to start putting the mast together.
I'm taking the mast head to my dad's shop probably sunday to start the plan for putting it on the mill and drill/tap for each of the peices. sadly the mast itself can't go orwould it fit inside so we'll be hand tooling that for the new clamshell exit points and bracket mounting.