Hi Don,Is there any guideline for chain and rode replacement. I have a combimation chain and rode which is 16 years old - still looks OK but it is not something you want to trake chances on.
Yes it should, if you can find a scale that will resolve ounces per hundred pounds. But iron oxide will be heavier than pure iron so the oxides would have to wear away. By the time that happens you should see the problem.Hi Don,
I don't know if this is proper, but if you weigh the chain when new shouldn't it get lighter when it corrodes?
All U Get
I would chop off the last three feet and splice in a new thimble when I did that.A good idea is to rotate your anchor line end for end. I have 200 feet of line, every couple of yrs I switch ends. This spreads the wear.
You could chop it there too and splice in a thimble if you like. I would be most concerned about wear at the point on the rode where it crosses the bow roller or however you lead it over the rail of the the boat. After one reversal I would consign it to the kids for swings.Ha! What about the middle???
![]()
It is all but impossible to splice used braided line but used laid line is not so bad.If not already done, put a thimble in both ends when the line is new. It's not always easy- or possible- to splice used rope. The local rigger at West won't even try to splice used line.
If you have a windlass, that's not such a great idea. Even without one, thimbles make it harder to raise the anchor through the bow roller. Our older chain to rode splice was great, haven't gotten around to doing it with our new rode, chain and Rocna anchor.If not already done, put a thimble in both ends when the line is new. It's not always easy- or possible- to splice used rope. The local rigger at West won't even try to splice used line.
If you have a windlass, that's not such a great idea. Even without one, thimbles make it harder to raise the anchor through the bow roller. Our older chain to rode splice was great, haven't gotten around to doing it with our new rode, chain and Rocna anchor.