Finished my winter project. We now have two new water tanks and one new fuel tank. Boat is back together for the first time since Oct. As easy as it is to replace tanks on this boat, it still took awhile for various reasons. The old tanks had their original stickers on them and I could order by part #. I added two pickups on the fuel tank for a polishing system..The engine pickup shoulda had at least a half pipe of air in it. Ran the engine over an hr and it never even coughed.....I was waiting for it to die and then have to bleed it. Strange....Now for the spring projects......