T
Tony
I've just bought a west marine bosun chair and will plan on going up the mast for some work over the weekend. I replaced one halyard with a new line to make sure that there are no surprises given that the one line that I have is pretty old. I've since started thinking about the sheeve mechanism on the top of the mast - how can I tell if the block and sheeve will be able to support a 180lb weight? My halyard runs inside the mast and comes out of the mast on top and right above the moom on the side - someone mentioned that if the block or sheeve breaks under load the halyard holding me will break the fall since it runs out of the mast. Is this thinking correct, or will I keep falling all the way down 