Hey Peggie,
I'll be installing a new PHII, hoses and tank this spring and I was looking through the installation instructions for the PHII. For the below waterline installation, it shows a vented loop between the toilet and the holding tank. I don't recall a vented loop in that line when I ripped out the old system. Is that something I need if I don't have a macerator and overboard discharge? I'll only be running the discharge up to a deck pump out fitting.
Another thing, I am trying to fit a larger holding tank into the space where the old tank sat and I think I may be able to have the discharge line exit out the bottom of the tank but I'm not sure that's such a good idea. What do you recommend, out the side an inch or so off the bottom or out the bottom? My rationale for not going out the bottom is that it will always have "stuff" in the line, even after pumping out.
I'll be installing a new PHII, hoses and tank this spring and I was looking through the installation instructions for the PHII. For the below waterline installation, it shows a vented loop between the toilet and the holding tank. I don't recall a vented loop in that line when I ripped out the old system. Is that something I need if I don't have a macerator and overboard discharge? I'll only be running the discharge up to a deck pump out fitting.
Another thing, I am trying to fit a larger holding tank into the space where the old tank sat and I think I may be able to have the discharge line exit out the bottom of the tank but I'm not sure that's such a good idea. What do you recommend, out the side an inch or so off the bottom or out the bottom? My rationale for not going out the bottom is that it will always have "stuff" in the line, even after pumping out.