Hi all,I have my mast down while repairing the step. I also had to remove the compression post. The sole has sagged approximately a quarter inch under the compression post (it sits above a stringer). Removing the post has removed most of the sag. From what I've seen in the archives, this is a common problem on this model. The side of the stringer I can see through the bilge has no evidence of cracks or anything. Anyway, since I do not feel comfortable cutting up the sole and fiberglass underneath (and the stringer) I'm thinking of jacking up the floor slightly through the bilge, drilling into the stringer under the post, and if it is hollow, filling with cement (concrete). I've tested some cement at home by mixing it thin enough to pour into the stringer and replicating the width and depth of the stringer, including a small pour hole, and it seems to be impressively strong. Anyone think this is a bad idea?