V
Vulkin'
I moved for a new job. Had the boat shipped from Savannah GA to Huntsville AL. Even though I had asked for them to not derig until I was there by the time I arrived the boat was completely derigged. I am now trying to put it all back together. I already have the mast up, the main halyard and Jib halyard are in place. Now I am working on the boom. I got some drawings of the original set up from Hunter. The original set up had a reefing system (never worked in the 10 years I have owned the boat) that had lines that run into the boom to a block suspended inside of the boom. Now to the question. If I want to replace this system do I simply remove the end of the boom to get to the innards or is this the hard way. In other words my next step appears to be removing the end of the boom unless someone here knows of and easier way.
Thanks
Barry
Thanks
Barry