Just stacked my bench for the next few days trying to play catch up from a horrible winter... It really set me behind.
In the next week I need to get all this done from L to R...
This list is just scratching the surface.... Arghhh this winter sucked!
Okay back to work.....
In the next week I need to get all this done from L to R...
- Install new house bank of four G-31 AGM's and completely re-wire the bank 1982 pilot house sailboat.....
- Rebuild an abused Espar heater and re-install it on a 38' Down Easter..
- Autopilot installation on a Sabre 32
- Install 120A alternator, regulator and sensors as well as some other tweaks on a J-Boat..
- Rebuild and reinstall a 55A Yanmar/Hitachi alt for blown diodes on a Pearson.
- Install a feathering prop
This list is just scratching the surface.... Arghhh this winter sucked!