Last Christmas I had asked the members their thoughts on installing solid teak hardwood flooring and it opened up a wide range of opinions. I did install it and thought I would try to share a photo of the results. So far it has stood up very well but I do kick myself every time a tool or something was not secured for sailing and a small dent appears. My buddy says it's just adding character. Guess that happens on any decking.If the photo does not appear and anyone has an interest email me off line toyroom@ns.sympatico.ca
 

Attachments

D

Dave

Fantastic

I've got what I think would be a small repair job near the v-berth entry. Your photo has provided some inspiration for doing a much larger job. How many hours would you estimate that you put into your project?
 

Rick

.
Oct 5, 2004
1,098
Hunter 420 Passage San Diego
Time and cost

Dave, It took two of less than a 40 hours. The majority of that was spent on shaping the pieces that go up the slants by the galley,quarterberth and v berth closet. The flooring is prefinished Brazilian teak purchased at the local home flooring supplier. It's only 1/2" thick by 2 1/2" wide which allowed for some flexibility. Every other row was countersunk and screwed to the fibreglass sole with 1 1/4" stainless screws inserted into a stainless cup washers which I bought from Stirling(also a member of this forum) to give it a tidy factory look. He had these manufactured and are of a really nice quality. The slats without screws are held in place by the tongue and groove and I also ran a small bead of 3M 4000. Removal in the future should be quite simple. For some of the more difficult pieces, we contoured the backside with an orbital sander then used a car scissor jack and 2x4 to the deck head, applied the 3M 4000, inserted the screws and let it set overnight.Total cost was around $350 Cdn. Like any boat related maintenance, if you have to hire someone, I don't think I'd recommend this. What prompted me was that to do the traditional teak and holly, one 4x8 sheet was not enough and well over half of a second sheet would be wasted. At $300 a sheet and the time and effort to apply several coats of finish, I opted for this.
 
Status
Not open for further replies.