Alright guys, I have my assymetrical spinnaker ready to rig... one question: do I drill a hole in my mast for the new halyard hound? Or rig the new hound to the mast head, using the existing bolts for the mast crane? I'd prefer the mast head option, only thought is: would the sideways pull of the assymetrical be too much for the mast head with no side stays that high up?