I currently have a traditional main with single line slab reefing. The main has two reef points the single line runs from the cockpit to the mast then up to a block back down to the boom then back through the boom to the end of the boom then up to the aft reef ring and down to the boom again. Over the years I have not really liked this system because there is a lot of friction as the main goes up I normally have to pre pull the reef line. The other reason I do not like it is when I reef seem the forward reef point (at the mast) comes down first then as pressure is place on the reefing line it goes through the block and the aft end comes in. This puts a lot of pressure on the main sail car’s I have to help with the main. This last weekend as I put in a reef the pressure popped one of the cars as the stack was pressed down. So I have decide to go to single line reefing one line for the forward reef point and one for the aft reef point which should make this much simpler without stressing the main sail car’s. Has anyone done this? If so how did you run the reefing lines? I have been told to run the forward reef line to the mast then down so it pulls the sail forward some any thoughts on that? Any other thoughts or information would be helpful pictures would be great. Thanks.