Hi folks,
I've got a 1977 Ericson 29' that needs new running rigging. I'm ordering the rigging using the SailbotOwners.com running rigging calculator, which is an awesome tool!
I'm a little unsure about whether I should order the lines with or without whipped ends, and with or without spliced and shackled ends.
- Can I assume that if I'm replacing the current rigging, that I should order everything with whipped ends and with spliced and shackled ends?
- Or, is the correct answer "It depends", based on which halyard or sheets that we're talking about?
My boat currently has rope-to-wire mainsail and jib halyards, and I think I want to go with just rope halyards for the new ones.
Any advice you can give me will be very much appreciated, as I'm a little over my head in this endeavor.
I've got a 1977 Ericson 29' that needs new running rigging. I'm ordering the rigging using the SailbotOwners.com running rigging calculator, which is an awesome tool!
I'm a little unsure about whether I should order the lines with or without whipped ends, and with or without spliced and shackled ends.
- Can I assume that if I'm replacing the current rigging, that I should order everything with whipped ends and with spliced and shackled ends?
- Or, is the correct answer "It depends", based on which halyard or sheets that we're talking about?
My boat currently has rope-to-wire mainsail and jib halyards, and I think I want to go with just rope halyards for the new ones.
Any advice you can give me will be very much appreciated, as I'm a little over my head in this endeavor.