Have I said yet how Awesome you guys are?

The mast is currently off the boat while I figure out how who I want to re-rig it. . .I want to go to all rope halyards eventually, but the only questionable one is the main and I will probably just replace it for now. Can you tell by the pictures if the sheaves that are installed are the combo ones I can use rope with? They are "U" shaped with a groove in the center. . .or do I need new ones?
Second questions is, can use the second masthead sheave for a rope topping lift? Is there any reason I couldn't? I would like it to double as a safety line for a bosons chair. Currently, as you can see in the pic. . .the topping lift is a fixed wire and is adjusted at the boom (which sucks). If it was adjustable at the mast I could at least raise and lower the boom without having someone in the cockpit to hold it
Thanks!!
The mast is currently off the boat while I figure out how who I want to re-rig it. . .I want to go to all rope halyards eventually, but the only questionable one is the main and I will probably just replace it for now. Can you tell by the pictures if the sheaves that are installed are the combo ones I can use rope with? They are "U" shaped with a groove in the center. . .or do I need new ones?
Second questions is, can use the second masthead sheave for a rope topping lift? Is there any reason I couldn't? I would like it to double as a safety line for a bosons chair. Currently, as you can see in the pic. . .the topping lift is a fixed wire and is adjusted at the boom (which sucks). If it was adjustable at the mast I could at least raise and lower the boom without having someone in the cockpit to hold it
Thanks!!
Attachments
-
41.6 KB Views: 292