The deck teal on my O'day 25 was shot so I purchased new toe rails, hatch cover runners and handrails. Sealing the old deck holes for the toe rails and runners does not seem to be a problem. However, for the handrails, if I drill new holes in the deck, I will also have to drill new access holes in the cabin overhead.
Is there a way to do some lining up so I do not have to drill new holes in the deck, access holes in the cabin overhead. If there was a better way to approach it, did not think to post it. Last teak I replaced was on. Tanner 22 and it was easy. Thanks. Dan
Is there a way to do some lining up so I do not have to drill new holes in the deck, access holes in the cabin overhead. If there was a better way to approach it, did not think to post it. Last teak I replaced was on. Tanner 22 and it was easy. Thanks. Dan