So, what do you all think the advantages are of cutting the new packing material into separate rings, or just wrapping one long piece around the shaft, push it into the compression nut, and be done with it?
Warren,
The only advantage is a time savings of perhaps 60 seconds, the rest are all disadvantages...
Please don't do this. There is a good reason for cutting individual rings and that is because the stuffing boxes are designed for flat rings.
"Hey guys gas currently costs less than diesel, what do think are the advantages if I just mix a little diesel & gas?"
For illustrations sake I see your question the same way you'd probably see the one above..
The two "tail ends" will create un-even har spots or compression spots where there will be more contact on the shaft in one spot and less in another, thus potential for creating hot spots, or leak paths, that have uneven sealing potential. This can lead to incorrect adjustments, cocked packing and/or ruining of the shaft. The nut end and the log end are smooth and are designed to except a single flat ring. It takes under a minute to cut three rings with a sharp razor blade.
I think the stuffing box manufacturers like Buck Algonquin and packing makers such as Gore, marine authors such as, Calder, Casey et. al know what they are talking about. Marine installations are NOT the only industry to use packing. The major use of this is in industrial pumps, they cut rings just as the packing boxes are designed for.
Trying to reinvent the wheel, with the potential to sink your vessel or ruin your shaft is probably not the best choice for an experiment. Mixing two brands of varnish to get a desired color or patina? Well ok, that's a relatively safe experiment. Messing with a hole in your boat that is supposed to keep water out, when there is plenty of sage industry advice all pointing to the same installation technique, for a reason, strikes me a a bit, well, un-wise..
Have I pulled DIY installed single line flaxes out before? Sure, and they were always problematic, hence why they were pulled in the first place. Most of these shafts were badly worn and scored and the packing to drip rates were problematic. Could you get lucky? Maybe, but why do this when the labor to do it right takes about 60 seconds?