Just got a set of plans from Alden and they include a revision for reinforcing the bow between the first and second bulkhead. They were drawn in 1963 and our boat does not have the work done- might be the answer to what happenned to the challenger heading to Ireland this past spring.
Involves a fore and aft stringer (3/4 by 4" plywood) located just under the 2 berths and added glass to the frames in that area. Since we have no holding tank I thought this would be one of many winter projects to tackle. The ceiling is also attached to firring strips between the frames and there for not attached to the frames at all.
Anyone had to do this yet? Doesn't look too complicated and probably worth it.
Jon
Involves a fore and aft stringer (3/4 by 4" plywood) located just under the 2 berths and added glass to the frames in that area. Since we have no holding tank I thought this would be one of many winter projects to tackle. The ceiling is also attached to firring strips between the frames and there for not attached to the frames at all.
Anyone had to do this yet? Doesn't look too complicated and probably worth it.
Jon