We have not reefed our h260 yet and all the rigging is new, we have installed the Rams head on the goose neck and have a diagram of the reef line threaded through the boom through the clew reef grommet and back to the boom, are the two mid sail grommets just simply tied around the boom with 1/4 line, does anyone have a pic of that?