It looks like my list is shaping up. I'm trying to avoid the "WhileImAtIts" but we'll see how it goes.
I have an '83 H31. the previous owner replaced the water heater less than a year before I bought the boat, but the shelf it sits on rotted beforehand and it still needs replacing. This board is one piece with the bottom of the cabinet under the galley sink. To replaced the board, I have to remove the back of the cabinet and the water heater.
I've taken measurements and found that the fuel tank can be removed through the same opening. I'm sure the tank has never been removed, so this seems like an idea opportunity to remove the tank and give it a thorough cleaning.
While the tank is out, I want to clean (maybe paint) the area around and behind it. I also want to replace any hoses in the that area that look like they need it. Namely the cockpit drain hose. If this hose were to fail where it exits the hull there is very little freeboard to prevent sinking. This hose is very difficult to get to with the fuel tank in place.
Also, I want to replace the wooden backing plate for the galley sink thru-hull with a fiberglass one. Obviously, this will need to be done during Spring haulout. I'd also like to extend the thru-hull so the seacock is above the the bottom shelf in the cabinet. By doing so, the new shelf will require a much smaller opening, and I can use the space without dropping items into the hull.
All that should keep me busy for a while.
What Winter projects do you have planned?
I have an '83 H31. the previous owner replaced the water heater less than a year before I bought the boat, but the shelf it sits on rotted beforehand and it still needs replacing. This board is one piece with the bottom of the cabinet under the galley sink. To replaced the board, I have to remove the back of the cabinet and the water heater.
I've taken measurements and found that the fuel tank can be removed through the same opening. I'm sure the tank has never been removed, so this seems like an idea opportunity to remove the tank and give it a thorough cleaning.
While the tank is out, I want to clean (maybe paint) the area around and behind it. I also want to replace any hoses in the that area that look like they need it. Namely the cockpit drain hose. If this hose were to fail where it exits the hull there is very little freeboard to prevent sinking. This hose is very difficult to get to with the fuel tank in place.
Also, I want to replace the wooden backing plate for the galley sink thru-hull with a fiberglass one. Obviously, this will need to be done during Spring haulout. I'd also like to extend the thru-hull so the seacock is above the the bottom shelf in the cabinet. By doing so, the new shelf will require a much smaller opening, and I can use the space without dropping items into the hull.
All that should keep me busy for a while.
What Winter projects do you have planned?