I am doing the bottom of a Hunter 23. The paint I am using is from West Marine. The information on the can indicates that the boat should be put in the water within 60 days. My question is why does it need to be launched within 60 days. I was planning on painting it this fall and not put it back in the water until next spring. Would that cause a problem if I don't get in back in within that 60 day time period.