I have a problem with the current system
Part of the problem is that the current system I have where the line is accessed at the base of the boon does not work well. The blocks at the end of the boon have deteriorated and it is very difficult to get any movement. (Replacing them appears to be somewhat of a task) Moving the line to the cockpit to me would just make it more difficult. This appears to be a poor design from the getgo. My thought is to secure a line on one side of the end of the boom, run it thru the sail to a block on the other side of the boom, and then forward on the outside of the boon to a closed jam cleat. Sounds easy but I am left handed!