I want to add a wind instrument, and replace my old SR Mariner knot indicator and log with a matching instrument.
The thruhull size for my current transducers is 2 1/8", the thruhull for the new transducer I am looking at is 42mm (1.65").
My current thruhulls need to be rebed or replaced as they have worked slightly loose over the years and started to (slightly) leak this year.
My delima is this, Do I:
A) Rebed the current thruhulls and just leave the dummy plugs installed (est 2 hours of work), and install the new transducers somewhere else
B) Glass over the old holes, sand and fair everything smooth (est 2 days of work), and install the new transducers in the same place as the old ones?
with A I have 2 holes in the hull that are no longer needed, but just as watertight and safe as they ever were, but have the new transducers in a less ideal position, for reasonably little effort.
with B I have no unnecessary holes in the boat, and the transducers in the ideal spot, but with a lot of extra effort and cost.
Thoughts?
The thruhull size for my current transducers is 2 1/8", the thruhull for the new transducer I am looking at is 42mm (1.65").
My current thruhulls need to be rebed or replaced as they have worked slightly loose over the years and started to (slightly) leak this year.
My delima is this, Do I:
A) Rebed the current thruhulls and just leave the dummy plugs installed (est 2 hours of work), and install the new transducers somewhere else
B) Glass over the old holes, sand and fair everything smooth (est 2 days of work), and install the new transducers in the same place as the old ones?
with A I have 2 holes in the hull that are no longer needed, but just as watertight and safe as they ever were, but have the new transducers in a less ideal position, for reasonably little effort.
with B I have no unnecessary holes in the boat, and the transducers in the ideal spot, but with a lot of extra effort and cost.
Thoughts?