Miss Izzy is getting a new starboard main bulkhead this spring. And none too soon. After about 7 hours of disassembling the interior cabinetry, I was able to see what awful condition the bulkhead was in.
 

Attachments

Sprega

.
Sep 12, 2012
115
O,day 27 Brownsville Marina
I only seem to be able to upload one photo at a time, so here's one of the old bulkhead
 

Attachments

Sprega

.
Sep 12, 2012
115
O,day 27 Brownsville Marina
I wish I had taken a before project photo. Here's one of the new bulkhead ready to fit, epoxy coat and glass in
 

Attachments

May 6, 2012
303
Hunter 28.5 Jordan, ON
Nice craftsmanship!

The original bulkhead appeared to have at least twenty years of serviceable life left in it.

;-)
 
Aug 20, 2010
1,399
Oday 27 Oak Orchard
Wow, I thought mine were bad! It's a wonder the chainplate didn't make it to low earth orbit.
 
Jun 29, 2010
1,287
Beneteau First 235 Lake Minnetonka, MN
I had one come out of my 25 like that.... the other one came out partially like that and the lower part of it in handfuls of something the consistency of peat moss......
 

Sprega

.
Sep 12, 2012
115
O,day 27 Brownsville Marina
Any other pics of Sprega? You must have had a fair amount of movement and noise from those bulkheads when you sailed.
Tfrench
Actually, tfrench, the chain plate remained pretty solid. That is why I was so amazed at the condition of the bulk head when I finally got it out. By the way, weren't you going to replace the same bulkhead in your boat?
 
Nov 2, 2012
50
oday 27 Morro Bay
Actually, tfrench, the chain plate remained pretty solid. That is why I was so amazed at the condition of the bulk head when I finally got it out. By the way, weren't you going to replace the same bulkhead in your boat?
Yes indeed, I replaced all bulkheads (4) forward and added a fifth aft behind the galley. Send me an email and I'll send you pics if you like. My email: tflb11@gmail.com.
 

Sprega

.
Sep 12, 2012
115
O,day 27 Brownsville Marina
New bulkhead is in place and starting to put "Miss Izzy" back togeather. Just a bit more glass work
 

Attachments

Sprega

.
Sep 12, 2012
115
O,day 27 Brownsville Marina
The other side. The Aquatec marine ply looks close enough to the teak in the other bulkheads that I am going to leave it with just the epoxy finish.
 

Attachments

Sprega

.
Sep 12, 2012
115
O,day 27 Brownsville Marina
A little slow going on the bulkhead replacement. Waiting for dry weather to install the chain plate. The cabinet in the head is back together, just needs to have the screw holes plugged. All of the trim is on the new bulkhead. Once the chain plate is installed I can put the upper cabinet and drawer unit back in the galley, get the screw holes plugged, tune the rigging, clean up the boat, put the cushions back aboard aaaaannnnnd GO SAILING!!!
 

Attachments

Sprega

.
Sep 12, 2012
115
O,day 27 Brownsville Marina
Bulkhead installation is complete. Just a few screw holes left to plug and some minor trim to do. Started getting the boat cleaned up this afternoon.
 