I am just sat having a coffee and a chat with a sailing friend after
completing the last "big" job (solar panel) - big smile! I have a
huge amount of stuff to tidy up and clear away but I think it is fair
to say that it is time the damn thing got wet! I missed the last lot
of spring tides on the River Mersey due to filling my fuel tank with
water - I was testing the bilge pumps and filled the bilge up with
water but forgot to screw the fuel tank dipstick in! Silly me - took
ages to get the motor running again! Really must move the tank one
day...
I did manage to navigate the Mersey in a friends yacht (route here https://flic.kr/p/bL3ZJX )
- nearly 50 waypoints, it was a real challenge! We eventually got
as far as Maryport on the Cumbrian coast feeling tired and sick...
orrible Easter weekend weather!
Anyway the beast will be launched next week and, as long as it floats,
I will spend some time getting all the bits of string and wires in the
correct places and checking to see that everything works. I guess it
will take a week or two to get ready... then I am off to Holyhead for
a month or so to work out how to sail it and then it will be time to
tackle the Bay of Biscay... must order more seasick tablets...
John
completing the last "big" job (solar panel) - big smile! I have a
huge amount of stuff to tidy up and clear away but I think it is fair
to say that it is time the damn thing got wet! I missed the last lot
of spring tides on the River Mersey due to filling my fuel tank with
water - I was testing the bilge pumps and filled the bilge up with
water but forgot to screw the fuel tank dipstick in! Silly me - took
ages to get the motor running again! Really must move the tank one
day...
I did manage to navigate the Mersey in a friends yacht (route here https://flic.kr/p/bL3ZJX )
- nearly 50 waypoints, it was a real challenge! We eventually got
as far as Maryport on the Cumbrian coast feeling tired and sick...
orrible Easter weekend weather!
Anyway the beast will be launched next week and, as long as it floats,
I will spend some time getting all the bits of string and wires in the
correct places and checking to see that everything works. I guess it
will take a week or two to get ready... then I am off to Holyhead for
a month or so to work out how to sail it and then it will be time to
tackle the Bay of Biscay... must order more seasick tablets...
John