I have re-stepped the mast but have not yet begun to adjust the shrouds or stays. The new forestay is attached at the masthead and I'm ready to cut it to length and make up the Norseman fitting for the stem (The jib halyard is supporting the mast now). I know the mast should rake back to the stern and probably should be done now before I cut the forestay, but I don't know how much rake to allow. If the main halyard is stretched plumb to the deck how far back from the mast should it be, at the deck? I am concerned that if I set the mast 90 deg. To the deck with no rake now, there won't be enough travel in the forestay rigging screw to create the rake, or am I wrong?
Craig V1519 Tern
Craig V1519 Tern