J
Jack Bristow
Here is our mast lowering check list. I hope these help someone, and would appreciate any improvements.1. Mast Lowering Checklist2. Remove boom3. Detach mast wiring4. Attach side support cables5. Put in mast crutch6. Put in chin pole7. Fasten jib halyard to pole8. Attach mainsheet tackle to pole and bow anchor eye9. Run mainsheet to port winch under all lines10. Release all lines from cleats and stoppers11. Check that mainsheet is cleated at bow12. Release pin from stem fitting and tie furler to life lines13. Push mast back14. Remove chin pole, mainsheet and side stays.15. Remove pin from mast step16. Remove wind instrument then more mast forwared to bow pulpit17. Remove forestay from upper fitting18. Lash furler and lines to mast using furlaker halyard19. Raise rudder and remove rudder line20. Raise motor21. Tie mast to mast crutch and stern cleats22. Tie mast to bow pulpit and carpet23. Attach tie downs to trailer24. Grease wheels