I'm hoping someone can provide some help here. I'd like to remove the original boom
roller reefing system and install jiffy reefing. I've got the jiffy reefing system figured out.
However, in removing the roller reefing, I'd also like to fit a 12 inch track to the mast and
attach the boom to it. In addition, I'd like to run the halyards through the mast.
So, the total project looks like this:
1. Remove original furling system (no idea how).
2. Install track on mast (no idea how, what parts I need, or where to get them).
3. Retrofit gooseneck for track with rams horns for new reefing system (no idea how,
what parts I need, or where to get them).
4. Install jiffy reefing system (got this one figured out, parts and installation).
5. Install mast exit fittings and run halyards through the mast (have parts and idea,
looking for input as to pros and cons).
Please, any comments on how-to, opinions about plans, or ideas about things to consider
are appreciated.
Thanks,
Jack
roller reefing system and install jiffy reefing. I've got the jiffy reefing system figured out.
However, in removing the roller reefing, I'd also like to fit a 12 inch track to the mast and
attach the boom to it. In addition, I'd like to run the halyards through the mast.
So, the total project looks like this:
1. Remove original furling system (no idea how).
2. Install track on mast (no idea how, what parts I need, or where to get them).
3. Retrofit gooseneck for track with rams horns for new reefing system (no idea how,
what parts I need, or where to get them).
4. Install jiffy reefing system (got this one figured out, parts and installation).
5. Install mast exit fittings and run halyards through the mast (have parts and idea,
looking for input as to pros and cons).
Please, any comments on how-to, opinions about plans, or ideas about things to consider
are appreciated.
Thanks,
Jack