I need help finding a reeving diagram for the main sheet on a Beneteau 33.7 First or any similar size boat that uses a main sheet rigging as follows:
The main sheet is fed from the cockpit by a series of blocks to the mast and then to the boom and subsequently through a single block with a Becket. This is the starting point of the reeving. The main sheet is then fed through a triple block attached to the traveler, then from the triple block to a second single block on the boom, then back through the triple block to a third single block on the boom, and finally back through the triple to the becket on the first single block to conclud the reeving.
I have tried to reeve the blocks in several different directions, clockwise, counter-clockwise, and in different orders with no success. I have also tried to emulate the Harken reeving diagran for a triple to triple with becket with no success.
The main sheet is fed from the cockpit by a series of blocks to the mast and then to the boom and subsequently through a single block with a Becket. This is the starting point of the reeving. The main sheet is then fed through a triple block attached to the traveler, then from the triple block to a second single block on the boom, then back through the triple block to a third single block on the boom, and finally back through the triple to the becket on the first single block to conclud the reeving.
I have tried to reeve the blocks in several different directions, clockwise, counter-clockwise, and in different orders with no success. I have also tried to emulate the Harken reeving diagran for a triple to triple with becket with no success.