I want to move or add another gate to the lifelines on my H33 because of the configuration of the finger dock in my new slip. Now the gate attaches to the arch and I want to move it one stantion forward. Any hints on the design would be appreciated.
Should I leave the existing gate as is and add a new one?
Should I have it professionally done or can I do it with Suncor hand swedge hardware?
The span is about twice as long as the existing gate, how to make it so the ends don't fall
over the side every time I open it?
Where is the best source for the materials?
Thanks
Should I leave the existing gate as is and add a new one?
Should I have it professionally done or can I do it with Suncor hand swedge hardware?
The span is about twice as long as the existing gate, how to make it so the ends don't fall
over the side every time I open it?
Where is the best source for the materials?
Thanks