S
sailortonyb
I will need to get a 51 ft. mast under a 49 ft. bridge.There are several ways this can be done...one is with a jiffy reefing mast, which doesnt exist yet, but should. Another method would be if i had a spring loaded extension mast which also doesnt exist yet, and finally, a way to heel the boat to lose 2 ft. of height.I think the low tech idea of heeling the boat will probably work best for now.My thoughts would be to lower the dink into the water and tie it fore and aft so it wont shift position and make a 4-part sling and attach it to my boom. Then get the heaviest crew mwmber ( myself) to sit in dink and pull down on boom to heel the boat.My first question is ....HAS ANYONE HERE EVER DONE THIS BEFORE?My next question is.......what angle would be necessary to lose approx. 3 feet in height.....i cant find my old trig tables and if i did , it would take me a while to remember how to use them. The current height is approx 51 feet above the water line including antennas and AWI. The centerline of the dink will be approx 9 ft. from the mast. Now you have your triangle, so what should my heel angle be?