We closed on the sale this past weekend. Now the fun begins.:dance:
The short list of projects:
The short list of projects:
- Replace the Colostomy bag with a 22 gallon hard tank (ordered), and all tubes and fittings
- Move water pump to bulkhead
- Replace counter top, faucets in head and galley
- Install Cabinet fronts port and starboard
- Re-cover cabin cushions
- Refinish cabin sole
- epoxy fill base of compression post
- Move 2 27 G batteries to location over shower sump
- Refinish cabin teak (table, bulk heads, knees, cabinets, drawers, table, etc...)
- Reinstall hanging cabinet over couter/sink with small microwave
- Refinish (strip and oil) deck grab rail and combing step teak
- remove gelcoat oxidation (poliglow stripper)
- Kiwi grip non skid
- Poliglow Hull and smooth surfaces on deck
- Install New VHF, Chart platter, stereo
- Keel fin extension aft (may wait until next year on this)
- misc wiring
- Lots of cleaning
- Bottom paint
- Bowsprit for Anchor
- Splash by May 1st
Attachments
-
10.6 KB Views: 289