I am about to tackle putting a "waste" thru deck fitting for pumping out the holding tank on older ODAY 25. Previous owner would bring the pump out nozzle in thru the forward hatch and insert in a small length of hose from the holding tank.
I want to do the install the right way...do I cut a 2" hole in deck then dig out core an additional 1"...then fill with epoxy, let cure and then redrill the 2" hole plus three smaller holes for the fasteners through the deck......or do I drill out a complete 3" hole, totally fill it with epoxy then drill the larger hole and fastener holes in the hardened epoxy?
Should I be adding any strengthening agent to the epoxy?
All ideas appreciated.
I want to do the install the right way...do I cut a 2" hole in deck then dig out core an additional 1"...then fill with epoxy, let cure and then redrill the 2" hole plus three smaller holes for the fasteners through the deck......or do I drill out a complete 3" hole, totally fill it with epoxy then drill the larger hole and fastener holes in the hardened epoxy?
Should I be adding any strengthening agent to the epoxy?
All ideas appreciated.