So a couple of weeks ago I had an incident where my shower sump failed and so did my float for my primary bilge pump. Luckily I discovered it before any damage. Needless to say I am now interested in installing a backup bilge pump and alarm. I have picked out the ideal location which is approximately 6 inches above the primary bilge pump and I want to do a proper installation. Is it considered ok to tee in to the primary discharge line with a flowback valve or should I run a new line to a new thru hull above the waterline? Also any recommendations as to the size to install as I think my primary is around 1000GPH, but not sure?
PS. My boat is a 2000 model Hunter 450 so any owners that have done this please comment?
PS. My boat is a 2000 model Hunter 450 so any owners that have done this please comment?