Hello all
Not a structural engineer, so thought I would ask. So my deck stepped mast has a weep hole at deck level, however minimal water comes out as it gets blocked with growth. have rheemed it but still the mast holds water. Would it be a structural issue if I drilled a small weep whole into the mast to assist with drainage?
Personally I think it’s a non issue but want to ask the brains.
Thanks
Greg
Not a structural engineer, so thought I would ask. So my deck stepped mast has a weep hole at deck level, however minimal water comes out as it gets blocked with growth. have rheemed it but still the mast holds water. Would it be a structural issue if I drilled a small weep whole into the mast to assist with drainage?
Personally I think it’s a non issue but want to ask the brains.
Thanks
Greg