you are at home figuring out a plan to do something on your boat. When you get the boat you check things out to see if the plan will work and it won't and the situation is harder than you thought that it would be.
I am trying to add a sump box into my boat for the shower. I have gotten the box all set up, pump in it and working, and a working float switch.
I went down to the boat and the path that I thought that I would be able to take with the drain line won't work. I have to run the hose and make 2 180 degree turns to run to the hose to where I want it to go.
The Catalina 30's bilge is sealed and only has small holes for wired to run forward. What I have to do is run the hose from the sump box and put a 90 degree fitting in the hose. Then the hose will run back to where the other hoses exit the bilge area. I will place another 90 degree fitting there. The hose will run from that area forward and go through an area where the fresh water hoses run through the bulkhead area. Once I am behind the sink I will add a vented loop. After the vented loop I will tie the sump drain line into the sink with a Y so that the water is being forced downward to the through hull. The Y should be above the water line which is good as well.
Do you guys think that this situation will work okay?
I am trying to add a sump box into my boat for the shower. I have gotten the box all set up, pump in it and working, and a working float switch.
I went down to the boat and the path that I thought that I would be able to take with the drain line won't work. I have to run the hose and make 2 180 degree turns to run to the hose to where I want it to go.
The Catalina 30's bilge is sealed and only has small holes for wired to run forward. What I have to do is run the hose from the sump box and put a 90 degree fitting in the hose. Then the hose will run back to where the other hoses exit the bilge area. I will place another 90 degree fitting there. The hose will run from that area forward and go through an area where the fresh water hoses run through the bulkhead area. Once I am behind the sink I will add a vented loop. After the vented loop I will tie the sump drain line into the sink with a Y so that the water is being forced downward to the through hull. The Y should be above the water line which is good as well.
Do you guys think that this situation will work okay?