Once again thinking about running some of the lines aft to the cockpit. Namely, the main and jib halyards, and the 4 reefing lines. Rather than a new mast base, a collar or a bail, all of which I believe would require some custom manufacture or mast removal to be steadfast, I'm thinking about drilling and tapping holes for 4 padeyes directly into the mast near the base, then attaching the blocks to those padeyes (1 double block on each side for the reefing lines, 1 single block on each side for the main and jib halyard respectively). The tapped holes should provide for a stronger attachment, and some Locktite should keep them from coming loose.
Why is this a bad idea? Am I wrong about my assumption that using a mast step, custom collar or bail would require either mast removal or custom design and manufacture?
Thanks,
Jack
Bella - V2620
Why is this a bad idea? Am I wrong about my assumption that using a mast step, custom collar or bail would require either mast removal or custom design and manufacture?
Thanks,
Jack
Bella - V2620