I have a 95 H26. Since the shrouds attach to u-bolts in the hull to deck flange, would that also be a suitable place to mount additional cleats? I would like two more cleats forward, but don't like the idea of cutting into the side of the anchor well to back up a ceck mounted cleat. Only down side I can see is line diameter might be limited to about 1/2 inch to get around the cleat.
What do you think?
What do you think?