I am getting ready to install my solar controller and something just occured to me. I was about to order wire to run from the solar controller to the ground bus at the engine as a case ground. But I am installing my solar controller next to my battery charger. I already have a case ground running from the charger to the ground bus. The case ground for the charger is a 6 AWG wire and recommended size for the controller is 10 AWG. Is there a downside to just jumping from the solar controller to the battery charger for the case ground?
Thanks,
Jesse
Thanks,
Jesse